Tank 6 Project – BLNG
Scope of Works:Installation of Electrical equipment and field instruments, LV and HV cable installation buried / above ground, Instrument/ LV cable termination, HV(3.3kV) cable jointing / HV(3.3kV & 11.0kV)Termination works, FO cable laying/splicing/testing including pre commissioning. Commissioning support to HV (11kV/3.3kV) transformer and switch gears in switch house
Tanjung Baram WHP Project, Kuching, Malaysia
Scope of Work: Provision of Fabrication, Hook Up and pre-Commissioning E&I Services for Tanjong Baram Wellhead Platform (TJBWP) which is of estimated total weight of 250.97 MT, is comprised of the Upper deck, Mezzanine deck & Lower deck which house Solar Power Array & Batteries, Power Distribution Panel, Utility Equipment and System Panel, Pumps, Electrical […]
Lambak Kanan Major Sewage Pump Station No. 1 & 2
Scope of Work: Upgrading of Main Switch Boards included re-engineering, procurement, live plant change over & demolish of existing electrical system, modification, installation & commission new pump control system with auto-changeover and new level control / alarm system. (Project included one year Defect Laibility Period).
Sungai Akar New Service Reservoir (5000 m3)
Scope of Work: Provide electrical, instrumentation & telemetry engineering design, procurement, installation and commissioning works for electrical power supply, compound lighting, lightning protection system, water flow measureing, indicating & recording, water level measuring, control & recording with local instrument control panel, RTU and UPS system. (Project included one year Defect Liability period).