25 Nov

Lambak Kanan Major Sewage Pump Station No. 1 & 2

Lambak Kanan Major Sewage Pump Station No. 1 & 2

UpgradeofMainSB982 UpgradeofMainSB98

Scope of Work: Upgrading of Main Switch Boards included re-engineering, procurement, live plant change over & demolish of existing electrical system, modification, installation & commission new pump control system with auto-changeover and new level control / alarm system. (Project included one year Defect Laibility Period).

25 Nov

Sungai Akar New Service Reservoir (5000 m3)

Sungai Akar New Service Reservoir (5000 m3)

SungaiAkarServiceReservoir21998 SungaiAkarServiceReservoir1998

Scope of Work: Provide electrical, instrumentation & telemetry engineering design, procurement, installation and commissioning works for electrical power supply, compound lighting, lightning protection system, water flow measureing, indicating & recording, water level measuring, control & recording with local instrument control panel, RTU and UPS system. (Project included one year Defect Liability period).