25 Nov

Kilanas New Service Reservoir (7500 m3)

Kilanas New Service Reservoir (7500 m3)

pic03 pic04

Scope of Work: Electrical & Instrumentation Works included engineering design, procurement, installation and commissioning of electrical power supply, compound lighting, lightning protection system, water flow measureing, indicating & recording, water level measuring, control & recording in local control panel and integrated with telemetry system. (Project included one year Defect Liability period).

25 Nov

BLNG MCHE Replacement Project

BLNG MCHE Replacement Project

mche1 mche2

Scope of Work: Onshore electrical and instrumentation construction and pre-commissioning works for the Brunei Liquified Natural Gas Plant – Main Cryogenic Heat Exchanger Replacement work at train 1, 2, 3 and 4.

25 Nov

BSP J Type Bungalow – 7 Units.

BSP J Type Bungalow – 7 Units.

jtype_bungalow_1 jtype_bungalow_2

Scope of Work: Supply & install electrical, Telephone and CATV including lighting fixture, switches & sockets, fans, DB, wires and carry out the conduiting & wiring works as per clients specification & requirement.