Scope of work: Installation and Fabrication Works (i.e: Pull, gland, terminate electrical cable etc),Testing and pre-commissioning activities,Ship loose materials preparations/ preservation/ packing/ tagging.
Author: admin
Tank 6 Project – BLNG
Scope of Works:Installation of Electrical equipment and field instruments, LV and HV cable installation buried / above ground, Instrument/ LV cable termination, HV(3.3kV) cable jointing / HV(3.3kV & 11.0kV)Termination works, FO cable laying/splicing/testing including pre commissioning. Commissioning support to HV (11kV/3.3kV) transformer and switch gears in switch house
Tanjung Baram WHP Project, Kuching, Malaysia
Scope of Work: Provision of Fabrication, Hook Up and pre-Commissioning E&I Services for Tanjong Baram Wellhead Platform (TJBWP) which is of estimated total weight of 250.97 MT, is comprised of the Upper deck, Mezzanine deck & Lower deck which house Solar Power Array & Batteries, Power Distribution Panel, Utility Equipment and System Panel, Pumps, Electrical and Instrument equipment/devices.
BSP 3D Project K-14 Labout Camp
Scope of Work: Electrical & Fire Alarm Works included engineering design, procurement, installation and commissioning of electrical and fire alarm system for the 500 men labour camp. (Project included one year maintenance contract).
Lambak Kanan Major Sewage Pump Station No. 1 & 2
Scope of Work: Upgrading of Main Switch Boards included re-engineering, procurement, live plant change over & demolish of existing electrical system, modification, installation & commission new pump control system with auto-changeover and new level control / alarm system. (Project included one year Defect Laibility Period).
Sungai Akar New Service Reservoir (5000 m3)
Scope of Work: Provide electrical, instrumentation & telemetry engineering design, procurement, installation and commissioning works for electrical power supply, compound lighting, lightning protection system, water flow measureing, indicating & recording, water level measuring, control & recording with local instrument control panel, RTU and UPS system. (Project included one year Defect Liability period).