Scope of Work:Fabrication and installation of steel support frame for Junction box,installation of new Negative junction box,Sparks gaps protection of the insulation joint against any surge or over voltage,CP Coupon as per recommendation in GS EP COR 111 including a test station which houses the monitoring cables, Assist vendor in commissioning of the installation to ensure the installation is in the adequate CP potential level as per GS EP COR 111 for all pipelines which were interconnected.