Scope of Work:Fabrication and installation of steel support frame for Junction box,installation of new Negative junction box,Sparks gaps protection of the insulation joint against any surge or over voltage,CP Coupon as per recommendation in GS EP COR 111 including a test station which houses the monitoring cables, Assist vendor in commissioning of the installation to ensure the installation is in the adequate CP potential level as per GS EP COR 111 for all pipelines which were interconnected.
Month: March 2016
Tank 6 Project – BLNG
Scope of Works:Installation of Electrical equipment and field instruments, LV and HV cable installation buried / above ground, Instrument/ LV cable termination, HV(3.3kV) cable jointing / HV(3.3kV & 11.0kV)Termination works, FO cable laying/splicing/testing including pre commissioning. Commissioning support to HV (11kV/3.3kV) transformer and switch gears in switch house
Tanjung Baram WHP Project, Kuching, Malaysia
Scope of Work: Provision of Fabrication, Hook Up and pre-Commissioning E&I Services for Tanjong Baram Wellhead Platform (TJBWP) which is of estimated total weight of 250.97 MT, is comprised of the Upper deck, Mezzanine deck & Lower deck which house Solar Power Array & Batteries, Power Distribution Panel, Utility Equipment and System Panel, Pumps, Electrical and Instrument equipment/devices.