Scope of Work: Onshore electrical construction, pre-commissioning and wet run of pumps for the topside.
Month: November 2015
Lambak Kanan Services Reservoir (5000 m3)
Scope of Work: Provide instrumentation engineering design, procurement, installation and commissioning of water flow measureing, indicating & recording, water level measuring, control & recording with local & remote control panel and integrated with telemetry system. (Project included one year Defect Liability period).
Kilanas New Service Reservoir (7500 m3)
Scope of Work: Electrical & Instrumentation Works included engineering design, procurement, installation and commissioning of electrical power supply, compound lighting, lightning protection system, water flow measureing, indicating & recording, water level measuring, control & recording in local control panel and integrated with telemetry system. (Project included one year Defect Liability period).