Scope of Work: Electrical & Fire Alarm Works included engineering design, procurement, installation and commissioning of electrical and fire alarm system for the 500 men labour camp. (Project included one year maintenance contract).
Month: November 2015
Lambak Kanan Major Sewage Pump Station No. 1 & 2
Scope of Work: Upgrading of Main Switch Boards included re-engineering, procurement, live plant change over & demolish of existing electrical system, modification, installation & commission new pump control system with auto-changeover and new level control / alarm system. (Project included one year Defect Laibility Period).
Sungai Akar New Service Reservoir (5000 m3)
Scope of Work: Provide electrical, instrumentation & telemetry engineering design, procurement, installation and commissioning works for electrical power supply, compound lighting, lightning protection system, water flow measureing, indicating & recording, water level measuring, control & recording with local instrument control panel, RTU and UPS system. (Project included one year Defect Liability period).